Railway problems we have solved
Failure investigation
A traction motor bracket cracking in service
Eighteen months from the first crack to a fleet-wide cure on an electric multiple-unit fleet: strain gauges on track to measure the real loads, a fatigue assessment of the weld, an inspection regime to keep the fleet running meanwhile, and a repaired weld toe as the fix. The final solution has an unmonitored safe life of thirty years.
Vibration and bolting
Roof antenna bolts failing early
The bolts holding a roof-mounted antenna raft were fatiguing long before their design life. Measurement found a local resonance of the raft itself, not a bolting fault. An end support bracket moved the resonance away from the running vibration and the failures stopped.
Crashworthiness
A vehicle end designed to survive a collision
A standard vehicle end and the same end with a crash structure, modelled in explicit dynamics and run through the collision scenarios of the European crashworthiness standard. The modified vehicle meets the standard; the comparison shows where the energy goes and what the structure behind the buffers has to carry.
These are real projects for real railway clients, told without names. The originals, with the pictures and the engineering detail, are on our ExcelCalcs engineering analysis page.
What we do for SmartFleet clients
- Calculations: structural sizing, bolted and welded joint assessment, fatigue to the welded-structures codes, loading and acceptance calculations, each one readable and checkable in the calculation library
- Investigations: when a part cracks, loosens or wears, we measure what it really sees in service, find the cause and prove the cure, as the three cases above show
- Specifications: a maintenance specification, procedure or checklist written or revised by engineers who know the vehicle, then running in SmartFleet with your tasks, your limits and your signatures
- Bolted joints: joint analysis and the tightening for the job, see Bolt Analysis
- Expert reviews on your SmartFleet records: Obsolescence Management, Accident Audit and Maintenance Optimisation, each an engineering judgement signed on the record it reviews
- Engineering management: supervision of a vehicle acceptance or a modification programme, with its document packages controlled from the start
How we work
- Measure before modelling: strain gauges, accelerometers and the signal processing to read them, on the vehicle, on track
- Analyse to the codes your acceptance body expects: finite element stress, fatigue, vibration, thermal and crash analysis, with the railway fatigue, shock and vibration and crashworthiness standards built into the assessment
- Show the working: calculations in ExcelCalcs with every formula visible as an equation, and the result signed on the SmartFleet record it supports
- Experienced engineers do the work with AI assistants, and a person checks every finding. How it is done
Training for your engineers
- Railway Vehicle Structural Integrity: one to five days, modular, from bolting and welding to fatigue, fracture mechanics, strain gauging and failure investigation
- Fatigue of Welded Structures: two days, with the exam and certificate of competence
- Delivered at your site, built around your vehicles and your cases; attendees keep web access to the material and a course forum afterwards
Who it is for
Fleet owners and maintainers who want an engineering answer, not just a record: why a part fails, what it is safe to run, what the specification should say, and the calculation that proves it.