Maintenance Optimisation
Let the readings set the interval
A maintenance plan written before the fleet ran is cautious. Tasks are done by the calendar whether the readings call for them or not, and the evidence to do better sits unused in the exam records.
What SmartFleet does
Who signs what: the maintainer's fleet engineer proposes a candidate task (its current interval, the readings on record and its cost per exam), the reviewing engineer analyses it (the wear rate from the readings, the limit, the proposed interval and the confidence, with the trend plot attached) and recommends a decision, and the fleet owner's engineering manager decides, which freezes the record.
Optional expert review
Give us the specification and the readings. You get the checks that could move from fixed intervals to condition-based monitoring, with the evidence and the saving set out, written into this register by our engineers.
Your specification, running live.
Send us one of your maintenance specifications, procedures or checklists, or the engineering problem you want solved, and we'll show it to you working in SmartFleet: your tasks, your limits, your signatures.
Send us your specification